ETF-CNL Terminology: Difference between revisions
Jump to navigation
Jump to search
(Created page with "{| class="wikitable sortable" style="width: 95%;" |- ! scope="col" style="background:#efefef;" align="left"; "width: 5%"| # ! scope="col" style="background:#efefef;" align="le...") |
(No difference)
|
Revision as of 13:17, 18 January 2022
| # | Term | Short Explanation | |
|---|---|---|---|
| 1 | Flexible Interpretive Structural Modeling | Extended version of Warfield's ISM; allows corrections while a structural model is being developed, or after it has been developed. | |
| 2 | Implication-matrix Model | mmmmmmmm | ref |
| 3 | Correction Procedures | Procedures and algorithms for editing an ISM structural model while if being developed or after it is completed | |
| 4 | Implication Structure | mmmmmmmm | ref |
| 5 | Scanning Method of Implication Matrix Development | mmmmmmmm | |
| 6 | Coupling Method of Implication Matrix Development | mmmmmmmm |